Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Gahn Mami
Country: Kosovo
Language: English (Spanish)
Genre: Music
Published (Last): 14 April 2017
Pages: 342
PDF File Size: 7.6 Mb
ePub File Size: 12.17 Mb
ISBN: 567-8-33348-652-8
Downloads: 19051
Price: Free* [*Free Regsitration Required]
Uploader: Grotaur

The average water vapour pressure over a period of 24 hours must not exceed 22 mbar. Do not place Functional Units below any ventilation grilles, air vents, or air conditioning grilles or in the immediate proximity of glass tile panels in direct contact with the outside.

The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions. Definition of the substations. In this case a mounting base is added to the lower part of each Functional Unit in order to facilitate the penetration of the cable and respect the bend radius necessary for its connection.

Installation of the switchboard. Pouring the cement top coat Block off the irons to avoid penetration of cement into the rail. The room must be equipped with standardised high level and low level ventilation. Altitude of the connecting points in relation to the cable flanges other than mounting base. M12x30 hook bolt 8. Geometry of the cable trough.

Fluokit M24+ – Schneider Electric |

Preparation of the sections Two profile sections must be laid out, one at the rear and one at the front, in the fluooit direction of the switchboard. The length of the cable is calculated as a function of the altitude [A] of the connecting point. This user manual does not list the locking-out procedures that must be applied. It’s a community-based project which helps to repair anything. Passages must be designed to permit easy maintenance for all of the substation’s elements circuit breaker, transformer, etc.

  EJERCITOS WARHAMMER HOMBRES BESTIA PDF

The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational. Installation of the frame. The correct functioning and lifespan of the product depend on respecting the installation, commissioning and exploitation instructions found in this manual.

Local requirements especially about safety and which are in accordance with the indications given in this document, must be observed. Compliance with this indication is compulsory, non compliance with this stipulation may damage the equipment. The dressing of a top coat of cement using a rule should eliminate any surface irregularities greater than 2 mm per metre.

No ducts of any kind must pass through the substation’s immediate environment without special protection sheaths or ducts. Our products are fully quality controlled and tested at the factory in accordance with the standards and regulations currently in force.

It can be used in a wide range of application 2m4 such as utilities, wind parks, industry, buildings, infrastructure and consumer substations. Threaded fasteners with grease: Advice that is appropriate for the various types of cable troughs.

Case of a type 2 cable trough. Painted sheet steel 2 mm vluokit. Fit shims below the sections 1 and 2 to set their level. Non respect of these instructions is likely to invalidate any guarantee. Rear deflectors Wall fixing bracket mm min. Layout on a type 2 cable trough, with width of more than 50cm Whenever the width of the cable trough exceeds 50 fluikit, it is necessary to fit the longitudinal support irons to support the left and right-hand uprights for each Functional Unit.

Preventive maintenance of the circuit breaker part Please refer to specific instructions See page 4. The average water vapour pressure over a period of one month must not exceed 18 mbar.

The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders. Respect the imposed distances see chapter 5. These are carried out by Schneider Electric or by a specialised technician, trained by Schneider Electric in the implementation of procedures, and who is equipped with specific equipment. This opening must have a section of about 40x40mm to allow for the passage of the n24 cable.

  C FROM THE GROUND UP BY HERBERT SCHILDT PDF

Its thickness must be about 40mm of cement dosed at kg of CPA. The irons also serve in levelling the cement topcoat. Symbols of information 06 Code for a product recommended and marketed by Schneider Electric 21 Nm Tightening torque value Example: Beyond this, account must be taken of the decrease in dielectric withstand.

Its thickness must be about 70mm of cement dosed at kg of CPA. Re-installation of the circuit breaker Proceed with the operations in the reverse order for rei nstalling the circuit breaker. The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders. Apparatus fluoikt and apparatus life depend on the compliance with the installation, commissioning and operation instructions described in this user manual.

Access to the substation. Browse services Field Services Optimize the life cycle of your assets, improve performance, safety, and reduce maintenance costs — all with an experienced provider of complete field services and a partner you can trust.

Fluokit M24+ – Mechanical control C430 – C430M – Operation – Maintenance

Do not do it! The delimitation of the civil engineering layout depends on the type and quantity of materials to be installed refer to the following chapters. Smooth finish top coat Un-surfaced exposed concrete 9.